Back
Production Operations with SAP Manufacturing Execution (2JN)
This scope item supports the following processes:
Production Operations with SAP Manufacturing Execution
No lanes are present in the pool, add at least 1 lane first
2JN - Production Operations with SAP Manufacturing Execution
You can add the lane only when the pool is highlighted
Production Planner
Production Order for FGME03 and
FGME04
BJ5 - Make-to-Stock Production - Discrete Manufacturing
BJ5 - Make-to-
Stock
Production -...
Create Planned
Independent
Requirements
Material
Requirements
Planning
Conversion to
Production
Order and
Assembly
Confirm
Assembly
Activities
BAPI: CO_MES_PRODORDCONF_CREATE_TT
Confirm
Assembly
Activities
Confirm
Assembly
Activities
Confirm
Assembly
Activities
BAPI: CO_
MES_
PRODORDCO...
BAPI: CO_
MES_
PRODORDCO...
BAPI: CO_
MES_
PRODORDCO...
BAPI: CO_
MES_
PRODORDCO...
BAPI: CO_
MES_
PRODORDCO...
BAPAI: MES_
GOODSMVT_
CREATE
Preview Goods
Receipt Slip
You can add the lane only when the pool is
highlighted
Production Supervisor - Discrete Manufacturing (EPO)
Review Material
Availability Status
for Production
Orders (Variant A)
Release Production
Order for Final
Assembly (Variant A)
Confirm Assembly
Activities
You can add the lane only when the pool is
highlighted
Production Operator - Discrete Manufacturing (EPO)
Material Staging
for Final
Assembly
Production Order for
FGME01 and FGME02
You can add the lane only when the
pool is highlighted
Warehouse Clerk
Preview Goods
Receipt Slip and
Label (Optional,
Variant A)
BAPI: MB_
MES_
GOODSMVT_...
No lanes are present in the pool, add at least 1 lane first
SAP Manufacturing Execution - Scenario 1
You can add the lane
only when the pool is
highlighted
Production Planner
Release Shop Order
and SFCs (Shop
Floor Control)
iDOC: Production
Order - LOIPROXX
Create Shop
Floor Control
Print Traveler
Dokument
You can add the lane only when the pool is
highlighted
Production Operator - Discrete Manufacturing (EPO)
Check
Component
Availability
SFC queued
Check Line
Monitor
Check Line
Monitor
Check Line
Monitor
Check Line
Monitor
Check Line
Monitor
Repair
Workpiece
Send Workpiece
to Stock
Connected Plant by the
Open Integrated Factory -
Festo Assembly Line
covered in the rapid-
deployment solution - OIF
Generation 1 2014
You can add the lane
only when the pool is
highlighted
System
Identify
Workpiece
Set next
operation
Identify
Workpiece
Set next
operation
Identify
Workpiece
Set next
operation
Identify
Workpiece
Set next
operation
Identify
Workpiece
Check Status/
Post Material
Comsumption
Post Material
Consumption
You can add the lane only when the pool
is highlighted
Production Supervisor - Discrete Manufacturing (ME)
Load
Parameters
Set Status
Complete
Load
Parameters
Set Status
Complete
Load
Parameters
Set Status
Complete
Load
Parameters
Set Status
Complete
Load Parameters to
Perform Quality
Control Workpiece
You can add the lane
only when the pool is
highlighted
External System
Initialize
Assembly
Empty Product
Carrier arrives
Drilling
Product Carrier
arrives
Coating
Product Carrier
arrives
Tempering
Product Carrier
arrives
Assembly
Product Carrier
arrives
Finished Good -
Transport to
Warehouse
Production Worker
Product
Carrier
Machine
No lanes are present in the pool, add at least 1 lane first
SAP Manufacturing Execution - Scenario 2
You can add the lane only when the pool is highlighted
Production Planner
iDOC:
Production
Order -...
Connected Plant by the Open Integrated Factory - Beckhoff Assembly Line
covered in the rapid-deployment solution - OIF Generation 3 2017
Release Shop
Order and SFCs
(Shop Floor
Control)
Create Shop
Floor Control
You can add the lane only when the
pool is highlighted
System
Check Component
Availability
SFC queued
Create Shop
Order for Cover
Create Shop
Order for Chip
You can add the lane only when the pool is
highlighted
System
Casing
Assembly
Chip Assembly
Cover Assembly
Camera Check
Weighing
Shall Removal?
Final Assembly
You can add the lane only when the pool is
highlighted
Production Operator - Discrete Manufacturing (ME)
Handover via Robot
Handover via Robot
Manual Rework
Finished Good -
Transport to Warehouse
Post Material
Consumption
You can add the lane only
when the pool is highlighted
External System
Cover Storage
Cover Printing
You can add the lane only
when the pool is highlighted
External System
Chip Storage
Chip
Programming
Production
Worker
Production Line for
Final Assembly
Production
Worker
Production Line
for Semifinish
Good - Cover
Production Line for
Semifinish Good - Chip