Back
Basic Handover of Bill of Material (1ZI)
This scope item supports the following processes:
Basic Handover of Bill of Material
No lanes are present in the pool,
add at least 1 lane first
1ZI - Basic Handover of Bill of Material
You can add the lane only when
the pool is highlighted
Production Engineer
Start Event
Start Event
Create Change
Master
Create
Manufacturing
Bill of Material
as Copy of
Engineering Bill
of Material
Rework
Manufacturing
BOM
Release
Manufacturing
BOM
Set Status of
Change Master
to Inactive
End Event