Recipe Handover to Production - Bill of Material (1QG)
This scope item supports the following processes:
Recipe Handover to Production - Bill of Material
No lanes are present in the pool,
add at least 1 lane first
1QG - Recipe Handover to Production - B...
You can add the lane only when
the pool is highlighted
Production Engineer
1QC Formulation -Recipe Development
1QC
Formulation -
Recipe...
Review Recipe
and Decide
Handover to
Production -
BOM
Copy General
Recipe to Site
Recipe and
Assign Plant
Check Assigned
Materials and
Release Site
Recipe
Define Plant
Specific Target
Bill of Material
for the Recipe
for
Synchronization
Simulate and
Execute
Synchronization
of the Recipe
into Bill of
Material
Check
Manufacturing
Bill of Material (
MBOM)
BJ5 Make-to-
Stock
Production -...
BJ5 Make-to-Stock
Production - Discrete
Manufacturing