The process starts with creation of a filling process order based on an internal or external requirement.
As a prerequisite, the tank trailer with a dedicated container ID should be weighed and the existing residual quantity should be posted to a separate residual storage location. This residual stock is considered during the subsequent filling process for the same container ID.
Using container ID as a reference batch characteristic, the batch and quantity of residual stock for the specific container ID is determined for the process order using batch determination.
The net quantity of manufactured product to be filled into the tank trailer is calculated by deducting the residual material that was already present in the tank from the total filling order quantity. A simple material quantity calculation formula is used for this purpose. The appropriate batches are selected using batch determination.
The filling process order is executed to complete the tank trailer filling process.