Basic Handover of Bill of Material

Handover to Manufacturing allows the user to create a Manufacturing Bill of Material from an Engineering Bill of Material within one step. The manufacturing Bill of Material is initially being created as a copy of the Engineering Bill of Material. With this step the system automatically generates a linkage between both Bill of Materials. As an optional step this newly created Manufacturing Bill of Material can be reworked with Change Management technology. Finally this Bill of Material will be release for productive use.

Key Process Steps Covered

  • Create change master
  • Create Manufacturing Bill of Material as copy of Engineering Bill of Material
  • Rework Manufacturing Bill of Material
  • Release Manufacturing Bill of Material
  • Set status of change master to inactive
  • Create product version

Benefits

  • Simple handover of Engineering Bill of Material to Manufacturing Bill of Material
  • Linkage between Engineering and Manufacturing Bill of Material helps to keep both structures in sync